Date:2021-10-06 14:52:28 Source:本站 Author:yahe heavy industry Click: 4次
1. Lift the pile;
2. Check;
3. Keep the perpendicularity;
4. Align the position, put down the pile machine and make it slowly sink into the soil to a certain depth (install the pile cap if necessary);
5. Check the pile position and axis;
6. Vibrate the pile to the design depth;
7. Move the pile machine to the next pile to continue the operation