  • Piling steps of pile driver:

    1. Lift the pile;2. Check;3. Keep the perpendicularity;4. Align the position, put down the pile machine and make it slowly sink into the soil to a certain depth (install the pile cap if necessary);5. Check the pile position and axis;6. Vibrate the pile to the design dep

    Piling steps of pile driver:
  • What measures should rotary drilling rig operators take in rainy season?

    1. If you operate a large tonnage rotary drilling rig and the soil at the construction site is soft, you must investigate the environment in advance before construction, for example, take a long bamboo rod or wooden rod. If the bamboo rod can be inserted into the soil without any effort, and the sit

    What measures should rotary drilling rig operators take in rainy season?